Ingenieurbüro Goebel
Herr Volker Goebel
Diplom-Ingenieur
Industrie-Meister Metall
Endlager-Planung
Stadtplanung
Infrastruktur-Planung
Zweck-Gebäude-Planung
Ahrstr. 7
58097 Hagen
Germany
info@ing-goebel.com
Tel 0178 40 49 665 DE
https://www.ing-goebel.de
https://www.arch-goebel.ch
https://www.ing-goebel.shop
Freiberufler nach § 18 EStG.
Steuer ID Nr. 83 721 895 409
Steuernummer 321 / 2185 / 0287
zuständig : Finanzamt Hagen
Veranlagungs-Bezirk 031
Bankverbindung – Züricher Kantonalbank
IBAN CH16 0070 0110 0038 6441 5
BIC ZKBKCHZZ80A
Wir zeigen Einnahmen und Ausgaben
wenn es öffentliches Geld ist ...
50 % Stelle - Stadtplanung - Hagen
Mitarbeiter der Stadtverwaltung
>>> DBHD stores nuclear high level waste like spent fuel and vitrified waste safely
>>> As DBHD is very affordable, some companies want to use it for MLW and LLW too
>>> DBHD can also store PU in 15 kg containers - and de-fixed nuclear weapon heads
>>> Some companies want to store hardest chemical waste in DBHD repositories
>>> DBHD is a geological storage facility that defines the highest level of SAFETY
>>> DBHD is possible in deep rocksalt / gas-tight closure by mountain pressure
>>> DBHD is 60 % cheaper !! than horiz. mines because of its "room efficiency"
>>> DBHD is : deep, dry and gas-tight storage down to 7.000 m - Eternally
>>> DBHD was developed over 9 years in Germany and is in Version 20 now
>>> 18.000 experts worldwide already have had a look on DBHD building plans !
>>> DBHD is based on a new deep big-diameter drilling technology called SBR
>>> DBHD is an all vertical shaft storage mine - deep, dry and fully gas-tight
>>> Every country, every company, every organisation build their own DBHD
>>> You need to buy a "License" for DBHD in shop - because you did not invent it
>>> DBHD opens doors for NEW BUIlLD NPP - DBHD is also a ww peace project ...
Film 1 (top) shows the "Above earth installations of DBHD 2.0.0 GDF International building site"
best viewed if you start the film, then click "YouTube" - and youtube opens with a bigger screen
Film 2 (bottom) shows the "sub-surface SHAFT where the HLW containers are stored in concrete pellets
all that happens in a deep old rocksalt or clayrock geology - deep, dry and with a gas-tight closure
Sie sind hier am Ende der Startseite, eigentlich wollen Sie in den SHOP zu den
Artikeln, den Lizenzen für : Endlager-Schächte, Standorte, Verguss-Hallen - oder ?